|
Surname |
|
S-ID |
00000 |
Specification |
|
WPS-no. |
|
Test |
|
Date of welding |
|
|
|
|
|
WPS related |
Quality levels |
|
B |
C |
D |
t₁ |
= |
mm |
b₁ |
= |
mm |
|
|
|
|
t₂ |
= |
mm |
h₁ |
= |
mm |
|
|
|
|
|
|
|
D₁ |
= |
mm |
b₂ |
= |
mm |
|
|
|
|
b |
= |
mm |
|
= |
mm |
|
|
|
|
|
|
|
c |
= |
mm |
h |
= |
|
|
0.0 - 1.5 mm |
|
0.0 - 1.5 mm |
|
0.0 - 1.5 mm |
|
α |
= |
° |
|
|
|
|
|
|
|
|
|
|
β |
= |
° |
|
|
|
|
|
|
|
|
|
|
R |
= |
° |
|
|
|
|
|
|
|
|
|
|
Visual inspection: ISO 17637 / Assessment norm |
|
502 = max. weld reinforcement / 504 = max. root reinforcement |
Mistake code |
Assessment |
|
Measuring point 1 |
Measuring point 2 |
|
|
Sample |
DL |
WL |
b₁ [mm] b₃ [mm] |
502 max 504 max |
h₁ [mm] h₃ [mm] |
b₂ [mm] b₄ [mm] |
502 max 504 max |
h₂ [mm] h₄ [mm] |
506 |
507 |
509 |
511 |
515 |
5011 |
5012 |
5013 |
|
accepted / not accepted |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Radiographic testing: ISO 1763ff / Assessment norm ISO 10675-1 |
|
Densitometry |
Reference No. ISO6520 |
Assessment |
Sample |
ISO 6520-1 |
BPK-F |
2011 |
2012 |
2016 |
303 |
401 |
402 |
5011 |
|
|
accepted / not accepted |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Fracture test: ISO 9070 / Assessment norm |
|
Reference No. / Reference: ISO 6520 |
Assessment * |
Sample |
DL |
WL |
position of fracture |
2011 |
2012 |
2016 |
303 |
401 |
402 |
|
|
accepted / not accepted |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
*) a = accepted, not accepted = not accepted |
With the acceptance of the test, the examiner or the test supervisor confirms that there is no conflict of interest with the subject and that there was no participation in the qualification. |
|
|
Ja |
|
Nein |
|
The identity of the test participant was verified and established using a valid, official photo document. |
|
|
Ja |
|
Nein |
|
The suitability of the test participant was checked and determined. |
|
|
Ja |
|
Nein |
|
The suitability of the examination location and theory examination was checked and determined before the start of the examination. |
|
|
Ja |
|
Nein |
|
The procedure for the technical knowledge examination was discussed with the test candidate before the start of the examination. |
|
|
Job knowledge (): |
|
accepted |
|
not accepted |
Type of test: |
|
Overall assessment: |
|
accepted |
|
not accepted |
|
|
Date |
|
Stamp, Name and signature of examiner or of examining body |
|
Supervising (Date, Surname, Signature) |
|